The comprehensive reconnaissance studies were resumed in mid 1989 and phase 1
and 2 studies were completed in 1991 and the water diversion was made possible
in 1995.
The
opening procession of the project body took place in 1380and the first four
units of the phase one are now in operation.
The project is located in Khuzistan province, 25.5km to Masjed-E-Soleyman town .
The most prominent feature of the project will be 46.7 million dollars of the
bud
get cut –off due to annual hydroelectric generation.
The objective is to generate
2000MW of Hydroelectric energy.
|